Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-includes/functions.php on line 4165 About - Tidal Lagoon

Our mission is to drive a critical change in the UK’s energy mix by developing infrastructure to harness natural power from the rise and fall of the tides.

Mark Shorrock, CEO

 

The return of British sea power

Twice a day, every day, the Atlantic Ocean surges up on to the UK’s Continental Shelf and around our coastline. This creates one of the highest tidal ranges in the world, an untapped energy source with huge potential.

In 2011, we set out to solve a century-old puzzle: how to harness natural power from the rise and fall of the tides, sustainably and at scale.

Tidal Lagoon Power was formed to develop, construct and operate tidal lagoon power plant in the UK and internationally.  To date, the number of potential gigawatt-scale UK tidal lagoon locations identified from an engineering, power generation and commercial viability perspective stands in double figures and could equate to over 25GW of installed capacity.

We are currently developing a national fleet of six tidal lagoons to meet up to 8% of UK electricity demand, or power for around 30% of UK homes, as well as progressing a number of potential projects overseas.

Having secured permission to build the world’s first tidal lagoon power plant in Swansea Bay, Wales –  an iconic pathfinder project that provides a scalable blueprint for a new, global, low carbon power industry – our work is currently the subject of an independent review of tidal lagoons, commissioned by the UK Government.  When it reports in autumn 2016, the Hendry Review can fire the starting pistol for the delivery of tidal lagoon infrastructure in the UK and worldwide.

Together with a world-class consortia of delivery partners, we will be ready.

 

The case for tidal lagoon infrastructure

Tidal lagoons will secure for generations among the cheapest electricity of all new power stations.  Power output is zero carbon, year round and entirely predictable, while flexible operation will help modernise the national electricity grid.

Near-baseload, 24 hour power generation can be achieved across a fleet of geographically dispersed projects.

Built to last for 120 years, double the lifespan of any other new power station, tidal lagoons offer power that you can rely on for the rest of your life.  Projects employ proven technology and their construction is both short and certain.

In addition, each project presents a unique set of opportunities to catalyse social, economic and environmental transformation.

Tidal lagoons are multi-billion pound, multi-functional infrastructure assets, capable of regenerating an entire region.

Starting in Swansea Bay, our projects will be built from a majority of UK content.  British-made turbine technology and engineering expertise will be at the heart of a new global industry, creating and sustaining thousands of skilled jobs in the UK steel and manufacturing supply chain.

Sitting at the heart of the community, tidal lagoons can host a variety of leisure, tourism, cultural and marine aquaculture ventures.  Our projects will also promote biodiversity, conservation initiatives and protect against coastal erosion, flooding and sea level rises.

We will encourage local investment and ownership, allowing UK institutions and the general public to take long-term ownership of our nation’s indigenous natural power assets.

 

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Info@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
King's Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs