Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-includes/functions.php on line 4165 Swansea Bay - Tidal Lagoon

An iconic, world-first infrastructure project in South West Wales

Swansea Bay Tidal Lagoon will be the world’s first tidal lagoon power plant.

The 320MW pathfinder project provides a scalable blueprint for our programme, opening up the option of a fleet of larger UK tidal lagoons to generate renewable electricity at a scale and low cost not seen before.

To date, approximately £35 million has been spent on project development.  With the exception of a commercial loan from Welsh Government this has been financed privately.

The project was awarded a Development Consent Order in 2015 and is primed for construction. Its major delivery partners include Atkins, General Electric, Andritz Hydro, Laing O’Rourke and Alun Griffiths Ltd.

Our aim is to start construction works on site in 2017, with the marine works (construction of the breakwaters/bund walls) commencing in early Spring 2018.  Construction of the entire project will take a maximum of five years to complete.

British institutions, led by Prudential’s InfraCapital and InfraRed Capital Partners, will provide equity funding for the business.  Macquarie Capital (Europe) Limited is advising Tidal Lagoon Swansea Bay (TLSB) on debt funding, and has received close to 40 expressions of interest to provide debt finance to the project.

The majority of project’s £1.3 billion capital spend will be on content sourced in Wales and across the UK.

Independent reports find that 2,232 construction and manufacturing jobs will be directly sustained by the build, supporting thousands of further jobs in the wider Welsh/UK economy. The project is expected to contribute £316 million in Gross Value Added to the Welsh economy during construction, followed by £76 million in each of its 120 years of operation.

The independent Tidal Lagoon Industry Advisory Group has, since 2014, worked to ensure that Welsh and UK industry is ready to secure a primary position in the tidal lagoon sector.

British-made turbine and generator technology and engineering expertise will be at the heart of the project, seeding a new global industry with significant export potential for UK manufacturers. The project will facilitate the creation of two new manufacturing facilities to be built in Wales, one for machining and pre-assembly of turbines and one for heavy fabrication of steel components.

Swansea Bay Tidal Lagoon requires only the rate of bill payer support currently offered to nuclear, a 60 year established industry. But because the project is small, its overall cost to households is also small: potentially as low as 20-30 pence per household per year, on average.

Economies of scale apply: large-scale lagoons generate cheaper power than small-scale lagoons.  The larger projects being prepared to follow the pathfinder at Swansea Bay could generate the cheapest electricity of all new power stations in the UK.

Research carried out by ComRes in May 2016 found that 84% of Conservative councillors and 83% of Conservative MPs are in favour of the project, which also features in the Conservative Party 2015 General Election manifesto.

Swansea Bay Tidal Lagoon is already world famous. The project has been presented to audiences across the globe, including to European Union energy ministers and at COP21, the 2015 Paris Climate Conference. International TV crews and press reporters have been regular visitors to Swansea Bay.

Public realm illustration

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Info@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
King's Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs