Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-includes/functions.php on line 4165 Planning - Tidal Lagoon

Swansea Bay Tidal Lagoon will be an offshore generating station with more than 100MW of installed capacity and, as such, is considered a ‘nationally significant infrastructure project’ (NSIP) under the Planning Act 2008.

NSIPs are consented under a different system to that managed by local authorities, being managed instead by the UK’s Planning Inspectorate and consented by the relevant Secretary of State. The Project lies in Welsh waters, meaning a Marine Licence (for dredging and construction) is also required under the Marine & Coastal Access Act 2009. Marine Licence applications are determined by the Marine Licensing Team of Natural Resources Wales (NRW) on behalf of the Welsh Government.

The Project cannot go ahead without both consents. Consent was granted by the Secretary of State for Energy and Climate Change when she made an Order (the Development Consent Order, DCO) authorising the development on 9 June 2015. The application documents, the Planning Inspectorate’s Recommendation, the Secretary of State’s decision letter, and the DCO itself are all available to view on the Planning Inspectorate’s website.

A decision on the Marine Licence is outstanding.

86% of the local community supported TLSB in our statutory pre-application consultation, which is uniquely high for a Nationally Significant Infrastructure Project.


Rachel Hall
Consents Coordinator

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Info@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
King's Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs