Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-includes/functions.php on line 4165 Key Statistics - Tidal Lagoon

320MW

Installed capacity of our pathfinder project at Swansea Bay

>530GWh

Reliable net power output every year, for 120 years

155,000

Approximate number of Welsh homes the project could power in full each year

11%

Proportion of Welsh domestic electricity consumption the project could meet each year

£1.3 billion

Private capital investment through construction, half of which is targeted to be spent in Wales

100,000

Equivalent number of Olympic swimming pools that will pass through our turbines each day

100,000 tonnes

Estimated total of (majority UK) steel required for project construction and manufacturing

311

Number of UK industrial businesses to attend our four supply chain awareness workshops to date

959

Swansea Bay residents are members of Active Supporters Groups that promote the project

86%

Proportion of local stakeholders to declare support for the project during community consultation

9.5km

Length of the lagoon’s breakwater

11.5km²

Area of sea enclosed by the breakwater

>50%

Efficiency of lagoon as a proportion of the available potential energy of the tide (Emax)

236,000 tonnes

Carbon savings during each year of operation

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Info@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
King's Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs