Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/index.php:3) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-content/plugins/wp-platform/classes/Setup.php on line 132 Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/tidallagoon.spindogs-dev.co.uk/httpdocs/wp-includes/functions.php on line 4165 Alec Dixon - Tidal Lagoon
Alec Dixon
Project Manager for Turbine Structures

Alec is a graduate Professional Civil Engineer and also holds a Diploma in Mechanical Engineering. With over 23 years of experience, more than 18 of which is in marine construction, Alec has acquired a combination of academic, practical and commercial experience in addition to accumulating a wealth of marine construction and engineering knowledge. Prior to entering the marine construction field, Alec gained significant experience in structural engineering while working as a Consulting Engineer. Alec has also held the position of Guest Lecturer at Stellenbosch University where he lectured Coastal Engineering Masters students on the topic of sub-sea pipeline engineering.

Alec has led on marine projects from concept development through to project implementation in Southern Africa, Madagascar, the Middle East, South East Asia and Australia. His areas of expertise cover both the design and construction of marine structures, sub-sea pipelines, immersed tunnel cooling water intake and outfall systems, and offshore mini-jacket structures.

As the Project Manager for the Turbine Structures for the Swansea Bay project, in the pre-construction phase, Alec will be responsible for developing the detailed engineering, construction programme and undertaking contract negotiations with the Tier 1 contractors leading to contract signing and financial close. He is also currently managing the Marine Works package and will lead this through the re-tendering phase to financial close. During construction his responsibilities will include the delivery of the contract packages. In addition, Alec supports the future lagoon programme giving input into construction planning and methodologies.

Tidal Lagoon Plc

E: Info@tidallagoonpower.com

T: +44 (0)1452 303892

A: Pillar & Lucy House
Merchants Road
The Docks
Gloucester
GL2 5RG
Tidal Lagoon (Swansea Bay) Plc

E: Info@tidallagoonpower.com

T: +44 (0)1792 274006

A: Suite 6
J Shed
King's Road
Swansea
SA1 8PL
© Tidal Lagoon Plc and Tidal Lagoon (Swansea Bay) Plc. | Designed and Developed by Spindogs